01
Automated takeoffs
October 2026
Floor plan
Living area, garage, and covered porch outlined, exterior walls traced, and doors and windows counted by type.
Electrical plan
155 devices, each counted against the electrical legend.
Foundation plan
Slab on grade, perimeter and interior footings, grade beams, and pad footings.
Teaching software to do a takeoff
A takeoff is mostly reading. An estimator works through the plans with the legend and schedules open, works out what every symbol and tag means, and then counts and measures sheet by sheet. We built a takeoff system at Constructable that does that reading on its own.
We ran our takeoff system on a residential plan set in a Constructable project. Working from the drawings, the system scoped the takeoff and set up 48 items in seven categories, from floor areas and wall lengths to doors, windows, electrical devices, the roof, and the foundation. Then the system placed 230 counts and measurements across four sheets, each one an ordinary takeoff mark that an estimator can check, adjust, and price.
The electrical plan is the part we keep coming back to. Our system matched 155 symbols to the legend and sorted them into receptacles, switches, lights, fans, and detectors. Where the drawings didn’t line up, like a door type on the plan with no entry in the door schedule, the system named the item for review instead of guessing.