Use Work Plans when multi-step field work needs a shared, signed checklist — a pre-pour QA/QC, a mockup review, a critical lift. Build the sections and items, name who signs each one and how they verify it, ask for the records you need as proof, block later items until an inspector signs, and download a signed PDF record when it's done.
Start here
- I build the plan: Create a work plan → Build the outline, sign-offs, and hold points → Publish a work plan.
- I do or inspect the work: Work an item and add proof of work → Sign off an item.
- I authorize or accept the plan: Authorize or accept a plan.
- I close out and keep the record: Close a plan → Download the signed PDF.
- I set up types and templates: Set up work plan types and custom fields → Set up verification methods → Set up work plan templates.
- Something is missing or blocked: Start with Troubleshooting Work Plans.
Common task recipes
- Set up a pre-pour checklist: Open Work Plans, select New plan, enter a Title, pick "Quality: Pre-pour" as the Type, then Create draft. Use Add section and Add item to build the outline, add people under Sign-offs on every item, and select Publish.
- Stop the pour until the special inspector signs: On the inspection item, add the inspector under Sign-offs, set Blocks to The rest of the plan, and pick the inspector under Unblocked when this person signs. To label the sign-off a hold point too, choose "Hold Point" in the verification method dropdown beside the inspector's name.
- Make the special inspection report part of the record: While the plan is a draft, open the item, select Add request on Requested records, and choose Inspection. Once the plan is in progress, whoever works the item selects Add inspection on that row and picks the inspection.
- Sign your item from the field: Open the plan from My Ball-in-Courts on the project Dashboard, open the item, add your notes under Proof of work and photos under Attachments, then select Sign, type your name, tick the confirmation, and Sign.
- Hand the owner a signed record: When the work is done, select Close plan, then open the actions menu and select Download PDF.
Understand access and workflow
Understand how Work Plans work
Work Plans sits under Field Tools, just below Inspections. Each plan is a numbered outline: sections group the items people perform, and every item names the people who sign it off against its Acceptance criteria.
Draft → In progress → Closed
- Draft is where you build the outline. Sections, items, Acceptance criteria, Type, blocking, and Requested records change only while the plan is a draft. Sign-off slots, including the people under Authorization and Acceptance, can also change while the plan is In progress.
- Publish always moves a ready draft to In progress and opens the items, even when Authorization is filled. Authorizers and acceptors sign during In progress. Until you publish, their rows read Opens after the plan is published.
- In progress is when the work happens. People change item status, write proof of work, add attachments, and sign. An item closes on its own when its last sign-off is in. Signing an authorization or an acceptance does not change the stage.
- Closed is the finished record. Close plan shows while the plan is In progress. It warns if items are still open or sign-offs are unsigned, and it does not wait for every acceptor to sign. Reopen plan returns a closed plan to In progress and keeps the signatures.
The status badge is the stage control. Its menu reads "Change to" and then Draft, In progress, or Closed. Closing a draft stays disabled until the plan is published. Choosing Draft from that menu deletes every signature, the same as Edit plan.
An extra status name sits inside one of those three stages and replaces the badge label. It does not change who is notified, and it does not change what is locked.
Ball-in-court is whose turn it is to act. It applies only while the plan is In progress. The ball sits with every unsigned authorizer, every unsigned acceptor, and everyone with an unsigned sign-off on an item that isn't blocked by an earlier item. A company slot puts the ball with every person from that company on the project until one of them signs. A placeholder has nobody assigned, so it isn't in anyone's court. Draft and closed plans have nobody in the ball. Plans in your court show up in My Ball-in-Courts on the project Dashboard and in Global Dashboard's ball-in-court list, typed as Work Plan. Their due date is the earliest due date among the items waiting on you. An authorization or acceptance on its own doesn't add a due date.
Every signature is typed: you enter your full name and tick a confirmation statement, and we save the name, the time, and the statement. Signatures can't be edited afterward.
Permissions, visibility, and platform availability
Work Plans needs the Project Management or Financial package. On a Field-package organization the tool doesn't appear under Field Tools, and work plans don't appear in ball-in-court lists.
Inside the tool, access splits into these permissions:
- View work plans opens the tool. Its "Level of work plan access" setting is either "All work plans" or only published plans where you or someone at your company authorizes, signs an item, or accepts.
- Work on items: change status, write proof of work, add and remove attachments covers the work itself, including linking the inspections, submittals, and list items an item's Requested records ask for. Its "Which items" setting is either "All items" or only items that you or someone at your company signs.
- Create work plans, edit drafts, publish and close plans covers New plan, everything in a draft, Publish, and Close plan. It also lets you link requested records on any published item.
- Edit published work plans, which moves them back to Draft and deletes their signatures shows Edit plan on a plan that's already been published.
- Delete work plans shows Delete plan.
- Record signatures on someone else's behalf turns other people's sign-offs, authorizations, and acceptances into Record signature buttons for you.
- Manage work plan types and templates shows Work Plan Settings in the web header. That opens Organization Settings → Field → Work Plans, where types, verification methods, templates, and status names are organization-wide.
Signing your own sign-off, authorization, or acceptance doesn't need any of the permissions beyond View work plans — being the named person is what counts.
By default, administrators, managers, and employees see all work plans and can create, edit drafts, publish, and close. Administrators and managers can work on every item; employees can work on items that someone at their company signs. Editing published plans, deleting, recording signatures for someone else, and managing types default to administrators and managers. Subcontractor, consultant, and owner roles see only published plans their company is named on, and can work on only the items their company signs.
Work Plans runs on desktop web, mobile web, and the native app.
- On desktop, the plan opens with the outline on the left and the selected item or overview on the right.
- In the app, the outline and each item open as separate screens; tap Overview at the top of the outline for the plan details and the Authorization and Acceptance lists. New plan is the plus (+) button in the header, and Edit plan, Download PDF, and Delete plan are in the plan's header actions menu.
- Work Plan Settings and Templates are only in the web Work Plans header. The app header doesn't show them.
- In the app, an item's Attachments take photos with the camera, from your photo library, or from the project's photos. Upload other files, and fill a Documents request, from a browser.
When something happens on a plan you're named on, we notify you through the Work Plans channel. Publishing mentions everyone in the ball at that moment, so an unsigned authorizer, acceptor, or item signer hears that the plan is open. When a blocking sign-off releases later items, those items' signers are notified. When the last acceptor signs, the plan manager is notified that the plan is ready to close. Closing notifies the acceptors. Choose how much of that reaches you under My Account → Notification Preferences → Channels; see Choose notification activity.
Troubleshooting Work Plans
Most surprises here come from the stage the plan is in, a blocking sign-off on an earlier item, or a missing permission. Find your symptom and work through the checks in order.
Work Plans is missing from Field Tools
Check the package first: Work Plans needs the Project Management or Financial package, so a Field-package organization never shows it. Then ask an administrator to confirm your role has View work plans under Work Plans in Project Settings → Roles and Permissions.
I can't see a plan a teammate is talking about
If your role sees only plans your company is involved in, you won't see drafts at all, and you'll see a published plan only when you or someone at your company authorizes it, signs an item, or accepts it. Also check the filter at the top of the list — Open hides closed plans; use All.
New plan is missing
You need Create work plans, edit drafts, publish and close plans. View access opens the list but doesn't create plans.
Publish didn't publish the plan
When something is still missing, Publish opens Before you publish and shows a message that the plan isn't ready instead of publishing. Work through the unchecked rows. The plan needs a title, at least one item, a title on every item, and no empty section. Sign-offs are not required. The title rows link straight to the items that need a name.
I can't sign an item
Check these in order:
- The plan has to be In progress. In a draft, your row reads Opens after the plan is published. On a closed plan, signing is locked until someone selects Reopen plan.
- The item might be blocked by an earlier item. Your row reads Blocked by an earlier item, and the item explains who has to sign first.
- The sign-off has to be yours, or your company if the slot names the company. A placeholder reads Nobody assigned until someone uses Assign a person or company. Someone else's row shows whose court it's in unless you have Record signatures on someone else's behalf.
Blocking settings are missing on an item
Blocking behavior appears under Sign-offs only after the item has at least one person to sign it, and only while the plan is a draft. Add the inspector or signer first.
We chose Hold Point, but later items aren't blocked
That's expected. Hold Point is a verification method — a label that says how the person verifies the work — and labels never block anything. To stop later items until someone signs, set Blocks under Blocking behavior on that item while the plan is a draft.
Proof of work or Attachments are read-only
You can edit them only while the plan is In progress, the item isn't blocked by an earlier item, and your permission to work on items covers that item — some roles can work only on items someone at their company signs. In a draft, those panels don't appear at all.
A requested record still reads Not provided
Photos and documents count once they're attached to the item. An inspection, submittal, or list item counts only once it's linked from that request's row, and a list item request takes an item from the list it names. If the row has no add button for you, check that the plan is In progress, the item isn't blocked, and you can work on that item.
Edit plan deleted our signatures
That's what editing a published plan does. Moving it back to Draft permanently deletes every authorization, sign-off, and acceptance, reopens the items those sign-offs closed, and everyone has to sign again after you republish. The confirmation tells you how many signatures will be deleted before you continue.
Work Plan Settings is missing
It's on the web Work Plans header, not in the app, and needs Manage work plan types and templates plus Open organization settings. It opens Organization Settings → Field → Work Plans.
Build the plan
Create a work plan
Start a plan as a draft, then build it out before anyone is asked to sign. Only a title is required to get started.
- Open Work Plans under Field Tools.
- Select New plan in the header. In the app, tap the plus (+) button.
- In New Work Plan, enter a Title, something like "Level 4 Deck Pour: Pre-pour QA/QC". When a template exists, Start from appears above the title. Blank plan starts empty. Pick a template to copy its outline.
- Optionally pick a Type and a Location. The type decides which custom fields the plan carries.
- Select Create draft.
The plan opens as a Draft with the next available number. You can change the number later in Overview. If another plan already uses it, you'll see Another plan shares this number.
New organizations start with these types: General, Quality: Pre-pour, Quality: Mockup, Quality: Inspection, Quality: Pre-install, Safety: Critical lift, and Commissioning. Types are organization-wide. Your list is different only if someone changed it under Organization Settings → Field → Work Plans → Work Plan Types. A project template does not copy types.
You now have a draft plan ready for its outline.
Build the outline, sign-offs, and hold points
The outline is the plan: what gets done, in what order, what "done" means, and who signs for it. Sections, item titles, Acceptance criteria, Type, blocking, and Requested records change only while the plan is a Draft. Sign-off slots can be added or removed in Draft or In progress.
Start with Overview at the top of the outline. That's where you set the Number, Title, Type, Plan manager, Location, and Description. If the type has custom fields, they appear in Overview too, right after Location, and they save as you go, the same as the fields around them. A required field you leave empty shows an error and isn't saved until you fill it in. Change the Type and the fields switch to that type's set. Once the plan is published, the same fields show read-only in Overview.
Then build the outline itself:
- In Outline, select Add section and name it — "Pre-pour preparation," for example. Naming a new, empty section adds its first item for you.
- Select Add item under a section for each step. Items are numbered by section: 1.1, 1.2, 2.1.
- Open an item to give it a title, write its Acceptance criteria — what has to be true before it's signed off — and set a Due date.
- Under Sign-offs, use Add person to name everyone who does or inspects the work. An item closes when all of them have signed. A slot can be a person, a company, or a placeholder. Add placeholder asks Who signs (Contractor, Subcontractor, Client, Consultant, or Other) and Role or title (optional). On a placeholder, Assign a person or company fills it later. A company option says Any of N people can sign when more than one person at that company is on the project. The assigned company row then counts how many people on this project can sign.
- Beside each person, pick how they verify the work from the verification method dropdown, Hold Point, Witness Point, or Test, for example. It starts on No verification method, and the choices come from the organization's verification methods. The label shows beside their name once the plan is published and prints on the PDF.
Use the three dots next to a section to Rename, Add item, Move up, Move down, or Delete section. Deleting a section that still has items asks Delete this section? first. On an item, Item actions offers Move up, Move down, Duplicate, and Delete item. Duplicate copies the title, criteria, due date, sign-offs with their verification methods, blocking, and requested records into a new item right below it. Delete item removes the item without asking.
Block later items where later work has to wait. Blocking stops later items from being signed off until one person signs this item — a special inspection before a pour, a mockup approval before production.
- Open the item and add at least one person under Sign-offs. Blocking behavior appears below them.
- Under Blocks, choose The rest of this section or The rest of the plan. Nothing turns blocking off.
- Under Unblocked when this person signs, pick the sign-off that unblocks the later items. It starts on the first person you added.
In the outline, a marker sits under the item so everyone can see where the line is, and the signer's row carries a Blocking badge.
Note: Choosing "Hold Point" as someone's verification method doesn't block anything. It's only a label. Blocking comes from Blocks alone, so set both when a hold point should actually stop the work.
Ask for the records that prove the item is done with Requested records, just below Acceptance criteria. Select Add request and choose Inspection, Photos, Documents, Submittal, or List item — for a list item, pick which open list it should come from. Each kind goes on an item once (once per list for list items). Use the X on a row to remove a request. Whoever works the item provides them after you publish; see Work an item and add proof of work.
Last, name who authorizes and accepts. On Overview, add people under Authorization (they sign off on the plan as written) and Acceptance (they sign at the end and get the final PDF). Both lists are optional, and both use the same person, company, or placeholder slots as item sign-offs. Filling Authorization does not hold the items. They open as soon as you publish.
You now have a complete outline with signers, criteria, requested records, and any blocking in place.
Who should be under Authorization versus Acceptance?
Put the people who approve the plan as written — the project manager, the engineer of record — under Authorization. Put the people who accept the finished work — the owner's rep, the quality manager — under Acceptance.
Can I add someone outside our company as a signer?
Yes. Sign-offs, authorizers, and acceptors can be anyone on the project team or in your organization, so you can name subcontractor, consultant, or owner contacts on the project. They'll see the plan once it's published. The Plan manager comes from your own organization.
Does a missing requested record stop anyone from signing?
No. Requested records is a checklist the signers can see, not a gate. People can sign, and items close, while a request still reads Not provided, so check the panel before you sign or accept.
Publish a work plan
Publishing locks the outline and opens the plan for work and signatures. Before you publish on the overview tracks what's left.
Before you publish checks two things on screen:
- Add the items to perform. At least one item, and no section left empty.
- Name every item. Every item has a title.
The plan also needs a Title. Sign-offs are not required.
When it reads Ready to publish, select Publish next to the stage badge, or open the badge and choose the In progress stage. The plan moves to In progress and the items open, whether or not Authorization is filled. Everyone in the ball at that moment is notified.
If something is still missing, the button takes you to Before you publish with a message instead of publishing.
You now have a live plan your team can work and sign.
Do the work
Find work plans and what's in your court
The Work Plans list shows every plan you can see on the project, with the ones waiting on you a tap away.
Open Work Plans and pick a filter: Open, My ball in court, Closed, or All. Each shows a count. Open is the default and hides closed plans. Search with Search work plans.
The list shows #, Title, Status, Ball in court, Progress, Type, Location, Manager, and Last updated. Progress counts closed items against the total.
Inside a plan, a button next to the stage badge jumps to the next item waiting on your signature, and Ball in your court marks Overview when you owe an authorization or acceptance.
Plans in your court also appear in My Ball-in-Courts on the project Dashboard and in Global Dashboard's ball-in-court list. Their due date is the earliest due date among the items waiting on you.
Work an item and add proof of work
While the plan is In progress, record what you did on each item so the signers — and the final PDF — have the evidence.
- Open the plan and select the item in the outline.
- Under Status, select the status badge and choose the new status: Open, In progress, Delayed, or Closed.
- Under Proof of work, describe how the work meets the criteria — what was checked, anything that changed. It saves when you click away.
- Under Attachments, upload files or add photos already in the project. In the app, you take photos, choose them from your library, or add project photos; upload other files from a browser. Use Download to get every attachment on the item as a ZIP.
If the item has Requested records, the panel counts how many are provided, and each row gets a check mark once it's covered:
- Photos is covered by any photo attached to the item, and Documents by any other file. Add them from the request's row or under Attachments — they land in the same place.
- Inspection, Submittal, and a list item request are covered by linking the record. Select Add inspection, Add submittal, or Add list item on the row and pick it. A list item request only accepts items from the list it names.
Linked records appear on the row as links you can open. Use the unlink icon beside one to remove it; the toast offers Undo.
An item closes on its own when its last sign-off is in, so you rarely need to set Closed yourself. If you do close an item while sign-offs are still missing, the outline shows a warning icon beside it and the item shows a "Closed with gaps." notice until those people sign. Those people can still sign while the plan is In progress. Closing the last item does not close the plan.
On the item page, Related items lists records tied to this item. Link item adds one. Empty, the panel reads Linked items show up on both records. The link shows on both records.
If an earlier item blocks this one, the item shows a lock icon in the outline and a notice naming who has to sign first. You can't change its status, proof of work, or attachments until that person signs.
Sign off an item
Your sign-off is your name on the item: you're confirming it meets its acceptance criteria. You need only view access and to be the person named on the sign-off.
- Open the item. The next sign-off button in the header, labeled with an item number, jumps to the next one waiting on you.
- Under Sign-offs, select Sign on your row.
- Review the Acceptance criteria shown in the dialog.
- Under Signature, type your full name.
- Tick "I confirm this item meets its acceptance criteria."
- Select Sign.
When yours is the last sign-off, the item closes. When your row carries a Blocking · required badge, your signature unblocks the items behind it — you'll see Later items unblocked — and their signers are notified.
A label such as Witness Point or Test beside your name is the sign-off's verification method: how the plan expects you to verify the work. It doesn't change what signing does.
To sign for someone else, you need Record signatures on someone else's behalf. With it, other people's rows show Record signature. Type their full name; we save the signature as theirs and record you as the person who captured it. Use this for the inspector who signed a paper form on site.
You now have a signed, timestamped sign-off on the item.
Authorize or accept a plan
Authorizers and acceptors sign while the plan is In progress. Their signature doesn't open the items and doesn't close the plan. If you're named, the button appears in the plan header.
- Open the plan. Select Authorize plan or Accept plan next to the stage badge. You can also select Authorize or Accept on your row in Overview.
- Type your full name under Signature.
- Tick the statement, "I authorize this plan to be performed as written." or "I accept the completed plan."
- Select Authorize or Accept.
When the last acceptor signs, the plan manager is notified that it's ready to close. The plan stays In progress until someone selects Close plan.
Until the plan is published, both rows read Opens after the plan is published.
What happens if someone changes an item after I accepted?
The plan stays In progress, and your acceptance stays. Changing an item's status does not delete acceptance signatures. Someone with write access still has to select Close plan when the record should be final.
Close a plan
Close the plan when the record should be final. You don't have to wait for every acceptor to sign.
Close plan appears next to the stage badge while the plan is In progress. You can also open the status badge and choose Closed. If items are still open or sign-offs are unsigned, Close this plan? warns you before it locks the plan that way. Select it and the plan moves to Closed. The acceptors are notified.
On a closed plan, Reopen plan, or In progress on the badge, returns it to In progress and keeps the signatures.
Closed plans leave the Open filter. Find them under Closed or All.
You now have a closed plan ready to export.
Change, export, or remove
Edit a published plan
The outline is locked once a plan is published. Sign-off slots can still be added or removed while the plan is In progress. To change sections, items, criteria, type, or blocking, you move the whole plan back to Draft, and every signature on it is deleted.
- Open the plan and select the actions menu next to the stage badge. In the app, it's in the header.
- Select Edit plan.
- Read Edit this plan? — it tells you how many signatures will be deleted.
- Select Move to Draft and edit.
The plan is a draft again, with the outline open for changes. Items that were closed by sign-offs reopen. Publish it again when it's ready, and everyone signs again.
This works at any stage after Draft, including Closed. On a draft, Edit plan just opens Overview and needs only Create work plans, edit drafts, publish and close plans.
Download the signed PDF
The PDF is the record you file or send to the owner: every item, every signature, and the history behind them.
- Open the plan.
- Select the actions menu next to the stage badge. In the app, it's in the header.
- Select Download PDF.
The PDF includes the overview and type details, the Authorization and Acceptance signatures, every section and item with its status, due date, criteria, requested records, proof of work, file names, sign-offs with signing times and verification methods, and blocking, followed by an activity log. Once the plan is published, each requested record reads "Provided" or "Not provided," with links to the inspections, submittals, and list items that cover it. The item page says Requested records and PDF files are included in full at the end. After publish, the download appends item photos, attached PDFs, and the PDFs of linked inspections, submittals, and list items.
You can download it at any stage. Unsigned rows read "Not signed," so the PDF also works as a progress snapshot.
Delete a work plan
Delete a plan that shouldn't stay on the project — a duplicate, or one started on the wrong job.
- Open the plan and select the actions menu next to the stage badge. In the app, it's in the header.
- Select Delete plan.
- Confirm Delete this plan?.
The plan leaves the Work Plans list. There's no restore on screen.
Configure plan types
Set up work plan types and custom fields
Types let each kind of plan capture its own details, a pour's mix design and placement area, a lift's crane and load. Types, status names, and verification methods are organization-wide. A project template does not copy them. Set them up on desktop web.
- Open Organization Settings → Field → Work Plans. From a project, Work Plan Settings in the web Work Plans header opens the same page on the Work Plan Types tab.
- On Work Plan Types, select Add work plan type, enter a Name, and select Save.
- Drag a row by its name to move it. The Type picker on new and draft plans lists types in this order.
- Open a type's name to build its fields with Add Field or Add Section.
The Edit column at the start of each row holds the pencil (Rename), the archive box (Archive), and, only on a type no work plan or template uses, the trash can (Delete). Renaming changes the name on every plan of that type. Archiving takes the type out of the Type picker. Plans that already use it keep it. Deleting can't be undone. Archived types collapse into an Archived section under the list, where Unarchive brings one back.
Plan statuses and Item statuses add extra names inside a built-in stage. The extra name replaces the badge label. It does not change who is notified, and it does not change what is locked.
Filling in custom field values on a plan uses Create work plans, edit drafts, publish and close plans and happens in the draft's Overview. Building the fields uses Manage work plan types and templates.
Set your types once and every plan of that kind asks for the same details.
Set up verification methods
Verification methods are the labels plan authors pick for each sign-off to say how that person verifies the work, a witness point, a test, a measurement. The list is organization-wide, so every project uses the same words. A project template does not copy it.
New organizations start with Hold Point, Measurement, Surveillance, Test, and Witness Point.
- Open Organization Settings → Field → Work Plans.
- Open the Verification Methods tab. Work Plan Settings in the web Work Plans header opens this page. Switch to that tab.
- Select Add verification method, enter a Name, and select Save.
- Drag a row by its name to change the order the dropdown lists them in.
The Edit column at the start of each row holds the pencil (Rename), the archive box (Archive), and, only on a method no sign-off uses, the trash can (Delete). Renaming changes the label on every sign-off that already uses it, which is usually what you want when only the wording changes. Archiving takes the method out of the dropdown. Sign-offs that already use it keep it. Deleting can't be undone, and a method that a sign-off uses can only be archived. Archived methods collapse into an Archived section under the list, where Unarchive brings one back.
Note: A verification method is only a label. None of them, Hold Point included, keeps later items from being signed off. That's Blocks, set on the item. See Build the outline, sign-offs, and hold points.
Your plan authors now pick from the same short list on every sign-off.
Set up work plan templates
Company templates let every project start a work plan from the same outline. A project template is a copy for one job. Deleting a template does not change work plans already created from it.
Company templates live on desktop web at Organization Settings → Field → Work Plans → Work Plan Templates. That page needs Manage work plan types and templates and Open organization settings.
Project templates live on the project. On desktop web, select Templates in the Work Plans header, or open Project Settings → Work Plan Templates. The page has Project templates, Company templates, and Copy to project. It needs Manage project work plan templates. The app header does not show Templates.